Claydon House
By Ellington Properties · Meydan · MBR City















Claydon House stands between the Ras Al Khor Wildlife Sanctuary and the community Crystal Lagoon at Meydan Horizon, in Mohammed Bin Rashid City. Residences look out over the lagoon, the sanctuary, or the Burj Khalifa skyline, and in some cases all three.
Homes run from one-bedroom apartments at 768 sq ft to four-bedroom-plus-study residences above 3,000 sq ft, with two and three-bedroom layouts in between, most carrying a study and a balcony.
The amenity deck is built around the water: adults and family pools with infinity edges onto the lagoon, landscaped podium decks, outdoor dining and barbecue areas, then a clubhouse, a co-working space set into the lobby, a fitness studio, a kids play area and an arcade room.
Meydan's underground metro line is a minute away, the Ras Al Khor sanctuary five, Downtown and the Burj Khalifa fifteen, and Dubai International Airport seventeen.
Meydan · MBR City · between the Ras Al Khor sanctuary and the Crystal Lagoon
The address is the argument. Claydon House sits between the Ras Al Khor Wildlife Sanctuary and the Crystal Lagoon, which means protected open water on one side and a protected reserve on the other. Neither can be built on, so the views are not a phase-one promise that a later tower takes away.
It is also central without being Downtown. Meydan's metro is a minute away, Business Bay fifteen, the airport seventeen. That suits a tenant who works in the city but does not want to live inside it, which is a deeper pool than the Downtown investor stock competes for.
MBR City is the corridor between Downtown and Dubai Hills, which is the point: the tenant gets fifteen minutes to Business Bay without living in the congestion of the Downtown core. That is an executive and family let rather than a short-stay one, and it turns over less often.
The structure is Ellington's standard: 20% on booking, staged to 70% by completion against certified progress in a RERA escrow account, 30% on handover, no post-handover debt. Two details matter here. The milestones start at 30% construction rather than 20%, so slightly more capital sits later in the build. And as one of Ellington's premium-tier schemes, resale is permitted only once 50% of the price plus the next instalment is paid, not the 30% that applies on their other projects. If an early exit is part of your plan, that is the clause to read first.
The honest gaps: the building is sold out at the developer, so entry now is through resale, and Ellington has not published a service charge. Treat any return modelled now as indicative, not a forecast.
Unit mix and specification
Payment plan
- 20%On booking
- 10%60 days after reservation
- 10%120 days after reservation
- 5%240 days after reservation
- 5%360 days after reservation
- 5%30% construction
- 5%40% construction
- 5%50% construction
- 5%60% construction
- 30%On completion
What is nearby
- Meydan Underground Metro1 min
- Ras Al Khor Wildlife Sanctuary5 min
- Meydan Grandstand10 min
- Dubai Design District10 min
- Dubai Festival City Mall12 min
- Business Bay15 min
- Burj Khalifa and Dubai Mall15 min
- Dubai International Airport17 min
- DIFC20 min
- Mall of the Emirates25 min
Questions buyers ask about Claydon House
Who is the developer of Claydon House, and where is it?
Claydon House is an Ellington Properties project in Meydan · MBR City, Dubai.
Can you still buy at Claydon House?
Claydon House is sold out from the developer. Speak to us about resale units or the developer’s next release.
What is the payment plan for Claydon House?
The payment plan is 70 / 30. 20% on booking, then 8 further instalments, 30% on completion.
When is the handover at Claydon House?
The developer’s handover date is Q4 2027.